Chadron State College - Armstrong PE Building Renovation and Addition

Althletic Director
SportsPLAN Studio and Leo A. Daly were selected in 2006 to conduct a facility audit, identify program requirements and prepare a feasibility study for improvements. Our team was subsequently engaged to complete the project in stages of new construction and renovation of the existing building. The design solution is the result of a series of collaborative workshops with a Project Steering Committee, Campus Facilities, Athletic Department Staff and the Chadron State College Administration.
The addition includes a new arena for athletic events, commencements and concerts, Athletic Department offices, a hospitality/trophy room overlooking the football stadium, a new football team locker room, an athletic equipment management center, new team meeting rooms and two new building entrances.
Renovation of the existing structure created a new strength and conditioning center, new sports medicine facilities and locker rooms for basketball and volleyball teams, staff, officials and visiting teams.
Services
Feasibility StudyProgramming
Master Planning
Design Consulting
Equipment Specifications
Operational Planning
Program Features
78,099 SF Addition20,062 SF Renovation
1,700 Seat Arena
6,100 SF Strength and Conditioning Center
Basketball and Volleyball Locker Rooms
Sports Medicine Center
Football Locker Room
Athletic Equipment Center
Hospitality/Trophy Room
Athletic Department Office Suite
Team Meeting Rooms
Project Manager: | Joel Leider |
Architect of Record: | Leo A. Daly |
Project Cost: | $15.5M Phase 1 |
Owner Reference: | Blair Brennan |
Completion Date: | 2014 |